Vodafone Building Smales Farm
Building overview
Location
Taharoto Rd Business Park, North Auckland
Size
18,105 m2
Energy Consumption
Around 4,500,000 kWh per year
Energy Costs
About 850,000 $ per year
Optimisation Target
Save 440,000 kWh per year
Methodology
An initial review of the building’s overall energy usage was conducted to identify usage patterns. We have undertaken a series of Energy Conservation Measures across identified opportunities for energy savings (HVAC, Lighting and BMS operation). Real-time data was collected from eve- ry energy-using entities allowing to monitor independently the efficiency of every performing areas within the building. Savings have been calculated for the entire building and verified by comparison with a baseline established using International Performance Measurement and Verification Protocol (IPMVP).
Building analytics
We developed an on-going statistical analysis process allowing predictive control and maintenance of the whole facility to minimize energy costs and maximize comfort and performance. We improved energy efficiency by creating customised and targeted rules for data analysis including building design specifications.
BMS control strategy
Changes included improving the monitoring ability of the BMS by improving communication networks and changing sensor types, control of fresh air intake by CO2 sensing, adjustment of set points based on solar gain, and the ability to utilise free cooling when outside air temperature is suitable.
Solutions
- Building-wide upgrade or replacement of BMS controls hardware
- Higher efficiency light fittings and associated controllers installed
- Installation of a metering system to enable identification of performing areas
- Complete re-design of the Building Management System Control Strategy (BMS)
- Implementation of an automated building analytics system to identify problem areas*
- Continuous commissioning process to tune the BMS for optimal efficiency*
Monitoring
Combination of Energy Management Systems and Building Analytics was the key to achieve operational efficiency of the building. Optimisation during the on-going monitoring period has been effective by continuous consultancy over maintenance services and performance control.
Impacts
11.3% – Reduction of energy use after first year
62K – End user energy savings after first year
3 years – EMS installation Return on Investment